Connectivity
8-Lane Mumbai-Nashik Highway
It was the largest BOT road project in India. The project involves increasing the number of lanes on the 99.5 km Vadape-Gonde (Mumbai-Nasik) section of the National Highway-6 lanes to 8 lanes.
Line 5 metro From Kalyan to Kapurbavadi
It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs. The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan railway station and Kalyan APMC.
MMC – multimodal corridor Virar to Alibaug
This Corridor will carry all the traffic from JNPT towards Navi Mumbai and Thane outside the city and will help reduce traffic congestion within the city. The travel time between Virar to Alibaug required today will also be reduced by 50%.
DP Road – Dombivli to Mankhurd link road
It’s a proposed development project road which is to be a 6-lane Highway connecting Dombivli and Mankhurd
- Viviana Mall – 15 mins
- Jupiter Hospitals – 15 mins
- Lodha World School – 15 mins
- Majiwada – 15 mins
- Vikhroli – 30 mins
- Powai – 40 Mins
- Central Suburbs – 40 mins
- International Airport – 60 mins
- National Airport – 65 mins