  6 Apartments

  2 -3BHK

  Stilt + 3 Floors

  1013 Sq.ft&1193 Sq.ft

 

2 Bed 2 Bath&3 Bed 3 Bath

 

7/10, Akbarabad 2nd St,

Akbarabad,Kodambakkam,

Chennai, Tamil Nadu 600024

 

   Status: Ongoing

 

Availability : Only 2 BHK

NAVIN’S KANDA

Picturesque looks…… Paradisiacal comfort!

Located at a prime spot, Navin’s Kanda is all set to bring your Dream Home to life with elegant design, upmarket specifications & best in class construction.

Premium 2 & 3 BHK homes, specially crafted with perfect planning to offer excellent comfort & luxurious lifestyle!

Features

  • Car parking for each flat
  • Security Intercom
  • Pleasing landscape
  • Rainwater harvesting
  • Driver’s toilet
  • CCTV with security cameras
  • Elegant and durable pavers for stilt parking floor and drive way
  • Acoustically insulated standby generator back-up for common area and for essential fan and light points
  • Strict adherence to approved plan
  • Automatic elevators with ARD function
  • Entrance and other floor lobby with granite flooring
  • Solar power for common areas
  • Schools
  • Colleges
  • Hospitals
  • Dine Out
  • Entertainment
  • Public Transport

security iconSecurity

Car Parking

solar power iconSolar Power for common areas

CCTV (with security cameras)

Floor Plan – First Floor, 2 BHK
2 BHK
Floor Plan – Second  floor & Third floor, 3 BHK
2 & 3 BHK

Structure

  • RCC framed structure

Walls

  • Aerated blocks in cement mortar

Flooring

  • 2*2 vitrified tile flooring inside the flat except toilets

Windows

  • Good Quality UPVC windows.

Toilet

  • Ceramic Tile Flooring and designer wall dadoing upto false ceiling height with Kohler or equivalent sanitary and CP fittings.

Doors

  • Elegant looking Teak wood framed main door with both sides PU finished Designer doors.
  • Bedroom doors with good quality timber frame with both sides polished imported moulded skin shutters.
  • Toilet doors with good quality timber frame with moulded FRP shutters.

Electricity

  • Three Phase Electrical power supply with concealed FRLS copper wiring and circuit breakers
  • AC points in living, dining and all bedrooms.
  • Modular switches

Finishing

  • Internal walls and ceiling are finished with putty and Navin’s Oyester White  Premium Emulsion
  • Outer walls are finished with premium anti – fungal emulsion paint

Lifts

  • 5 passenger Automatic Elevators of reputed make.

Water

  • Bore / Open Well for Tapping Ground Water. Sump to store water with arrangements for pumping water to overhead Tank.

Kitchen

  • Polished granite platform with 2 ‘ 0 ht ceramic tiles dadoing above counter
  • A stainless steel sink with drain board.

Staircase

  • Granite Flooring with SS Modular handrails.

Construction Update

July 2021

First Floor Blockwork 100 % Completed.

April 2021

Second Floor Roof Slab casted and First floor Blockwork

Second Floor Roof Slab  completed

March 2021

Second Floor Columns Completed​

March 2021

First Floor Roof Concrete Structure Completed​

February  2021

Stilt Floor Roof Structure Completed

January  2021

Stilt Floor Completed